It is not going to be a simple task to just bolt in. You do need to make, weld, build supports and such. Luckily for me that is not as issue I have all the equipment to do it.
As far as filling it I am actually going to just tee the two tanks together so they act as one. Nothing will change on the fill side of things, you fill like normal and the tanks both stay at the same level because they are plumbed together with a cross over line.
For drain I am going to add that to the cross over with a valve so they both drain together. Get rib of having to crawl under and take that stupid drain cap off. I might put a valve in the crossover so I can block off the second tank in case I just want to use one.
|