View Single Post
Old 01-06-2022, 10:58 AM   #9
rames14
Montana Master
 
rames14's Avatar
 
Join Date: Aug 2004
Location: Livermore
Posts: 5,150
M.O.C. #1920
Bill, do you have Super Solar or Solar Flex. On the Super Solar they have had two issues (both from companies that didn’t have issues before). The PD Transfer Switch, which acts as an EMS have about a 100% failure rate. keystone switched to Southwire now. The Progressive unit would not latch causing my unit not to charge. The Jaboni charge controllers are also failing and they have been replacing them with Victron controllers. If yours is not charging with solar on, you have an issue. After we had our new charge controllers and the PD Transfer Switch replaced (Super Solar did not need a second transfer switch, was only there for EMS) we have been very happy with it. There were four Super Solar rigs at rally this year. We all had our charge controllers replaced, some new programming updated, and new front and rear AC controllers to correct an issue with load shedding. We all, at our expense, installed Hughes Watchdogs to replace the transfer switch (we already have one in our Magnum inverter/charger). A very nice upgrade. User replaceable Surge Module and Bluetooth for monitoring.
__________________
Ron and Terrie Ames - MOC #1920/KF0NTA
2021Montana 3230CK Super Solar Legacy Package
2021 Ram 3500 Laramie Longhorn, BIM Charging
4x4, SRW, LB, Crew Cab, Pullrite 3900 Hitch
rames14 is offline   Reply With Quote